Update targeted ICASSP 2027 manuscript and results
This commit is contained in:
@@ -78,10 +78,23 @@ the science.
|
||||
causal active-speaker/floor estimator and require correct-time evidence to
|
||||
beat delayed, removed, and capacity-matched controls. Otherwise retain the
|
||||
honest audio-local paper and remove visual-method language.
|
||||
5. Rebuild with the official 2027 kit, keep technical content within four
|
||||
pages, put only references on an optional fifth page, and retain the IEEE
|
||||
AI-assisted drafting disclosure.
|
||||
5. Recheck the four-page technical limit after inserting results. The current
|
||||
build uses the 2027 kit and puts only references on page five; retain the
|
||||
IEEE AI-assisted drafting disclosure.
|
||||
|
||||
Passing gates 1--3 would support a solid ICASSP empirical paper. Passing gate
|
||||
4 with a meaningful matched-recall behavior gain would support the stronger
|
||||
method paper originally envisioned.
|
||||
|
||||
## Review 4: expanded five-page working preview
|
||||
|
||||
The layout now uses four pages for technical content and a fifth page for
|
||||
references only. The Introduction includes a causal task timeline; the
|
||||
method figure separates deployable inputs from privileged audit labels. The
|
||||
results presentation has measured main/oracle tables and a clearly labeled
|
||||
six-group **illustrative scenario** with explicit falsifiers. This improves
|
||||
readability and makes the intended experimental logic reviewable, but it does
|
||||
not raise the scientific verdict above borderline: L/T/C/B/H-Q/S values and
|
||||
full-pipeline efficiency remain unmeasured, and the scenario cannot be cited
|
||||
as evidence. Re-review after gates 1--4 and replacement of the scenario table
|
||||
with actual per-seed/per-session results.
|
||||
|
||||
Reference in New Issue
Block a user